TU Wien Informatics

20 Years

2020

2019

2014

  • Experiences and Challenges with Evaluation Methods in Practice: A Case Study / Kriglstein, S., Pohl, M., Suchy, N., Gärtner, J., Gschwandtner, T., & Miksch, S. (2014). Experiences and Challenges with Evaluation Methods in Practice: A Case Study. In Proceedings of the Fifth Workshop on Beyond Time and Errors: Novel Evaluation Methods for Visualization (BELIV 2014) (pp. 118–125). ACM digital library. http://hdl.handle.net/20.500.12708/55292
  • QualityTrails: Data Quality Provenance as a Basis for Sensemaking / Bors, C., Gschwandtner, T., Miksch, S., & Gärtner, J. (2014). QualityTrails: Data Quality Provenance as a Basis for Sensemaking. In K. Xu, S. Attfield, & T. J. Jankun-Kelly (Eds.), Proceedings of the IEEE VIS Workshop on Provenance for Sensemaking (pp. 1–2). http://hdl.handle.net/20.500.12708/55302
  • TimeCleanser / Gschwandtner, T., Aigner, W., Miksch, S., Gärtner, J., Kriglstein, S., Pohl, M., & Suchy, N. (2014). TimeCleanser. In S. Lindstaedt, M. Granitzer, & H. Sack (Eds.), Proceedings of the 14th International Conference on Knowledge Technologies and Data-driven Business - i-KNOW ’14. ACM Press. https://doi.org/10.1145/2637748.2638423

2013

  • Automated Test Case Generation in End-User Programming / Musliu, N., Slany, W., & Gärtner, J. (2013). Automated Test Case Generation in End-User Programming. In End-User Development (pp. 272–277). Springer. http://hdl.handle.net/20.500.12708/55075
  • Automated Shift Design and Break Scheduling / Di Gaspero, L., Gärtner, J., Musliu, N., Schaerf, A., Schafhauser, W., & Slany, W. (2013). Automated Shift Design and Break Scheduling. In Automated Scheduling and Planning, Studies in Computational Intelligence Volume 505 (pp. 109–127). Springer. http://hdl.handle.net/20.500.12708/28216
    Project: ARTE (2012–2017)

2012

  • A Taxonomy of Dirty Time-Oriented Data / Gschwandtner, T., Gärtner, J., Aigner, W., & Miksch, S. (2012). A Taxonomy of Dirty Time-Oriented Data. In Multidisciplinary Research and Practice for Informations Systems IFIP WG 8.4, 8.9, TC 5 International Cross Domain Conference and Workshop on Availability, Reliability, and Security, CD-ARES 2012, Prague, Czech Republic, August 20-24, 2012, Proceedings (pp. 58–72). Lecture Notes in Computer Science (LNCS) / Springer Berlin / Heidelberg. https://doi.org/10.1007/978-3-642-32498-7_5

2011

  • TEMPLE - A domain specific language for modeling and solving staff scheduling problems / Gärtner, J., Musliu, N., Schafhauser, W., & Slany, W. (2011). TEMPLE - A domain specific language for modeling and solving staff scheduling problems. In 2011 IEEE Symposium on Computational Intelligence in Scheduling (SCIS). Symposium on Computational Intelligence in Scheduling (SCIS), Paris, France, EU. https://doi.org/10.1109/scis.2011.5976550

2010

  • A Break Scheduling System for Supervision Personnel Using AI techniques. / Beer, A., Gärtner, J., Musliu, N., Schafhauser, W., & Slany, W. (2010). A Break Scheduling System for Supervision Personnel Using AI techniques. IEEE Intelligent Systems, 25(2), 60–73. http://hdl.handle.net/20.500.12708/165999
  • A hybrid LS-CP solver for the shifts and breaks design problem / Di Gaspero, L., Gärtner, J., Musliu, N., Schaerf, A., Schafhauser, W., & Slany, W. (2010). A hybrid LS-CP solver for the shifts and breaks design problem. In Proceedings of 7th International Workshop on Hybrid Metaheuristics (pp. 46–61). Lecture Notes in Computer Sciences. http://hdl.handle.net/20.500.12708/53204
  • A hybrid LS-CP solver for the shifts and breaks design problem / Di Gaspero, L., Gärtner, J., Musliu, N., Schaerf, A., Schafhauser, W., & Slany, W. (2010). A hybrid LS-CP solver for the shifts and breaks design problem. In Proceedings of PATAT 2010 - The 8th International Conference on the Practice and Theory of Automated Timetabling (p. 3). http://hdl.handle.net/20.500.12708/53591

2009

  • Testing while modelling staff scheduling problems / Beer, A., Gärtner, J., Musliu, N., Schafhauser, W., & Slany, W. (2009). Testing while modelling staff scheduling problems. In 23rd EUROPEAN CONFERENCE ON OPERATIONAL RESEARCH, BOOK OF ABSTRACTS (p. 198). http://hdl.handle.net/20.500.12708/52811
    Project: Softnet (2006–2011)
  • Temple - a language for staff scheduling problems / Schafhauser, W., Beer, A., Gärtner, J., Musliu, N., & Slany, W. (2009). Temple - a language for staff scheduling problems. In 23rd EUROPEAN CONFERENCE ON OPERATIONAL RESEARCH, BOOK OF ABSTRACTS (p. 198). http://hdl.handle.net/20.500.12708/52810
    Project: Softnet (2006–2011)
  • Local Search for Shift and Break Scheduling / Musliu, N., Beer, A., Gärtner, J., Schafhauser, W., & Slany, W. (2009). Local Search for Shift and Break Scheduling. In 23rd EUROPEAN CONFERENCE ON OPERATIONAL RESEARCH, BOOK OF ABSTRACTS (p. 102). http://hdl.handle.net/20.500.12708/52809
    Project: Softnet (2006–2011)
  • TEMPLE - A Modeling Language for Resource Planning and Scheduling Problems / Beer, A., Gärtner, J., Musliu, N., Schafhauser, W., & Slany, W. (2009). TEMPLE - A Modeling Language for Resource Planning and Scheduling Problems (DBAI-TR-2009-65). http://hdl.handle.net/20.500.12708/35721

2008

  • Scheduling Breaks in Shift Plans for Call Centers / Beer, A., Gärtner, J., Musliu, N., Schafhauser, W., & Slany, W. (2008). Scheduling Breaks in Shift Plans for Call Centers. In Proceedings of PATAT 2008 - The 7th International Conference on the Practice and Theory of Automated Timetabling (p. 17). http://hdl.handle.net/20.500.12708/52274
  • An Iterated Local Search Algorithm for a Real-Life Break Scheduling Problem / Beer, A., Gärtner, J., Musliu, N., Schafhauser, W., & Slany, W. (2008). An Iterated Local Search Algorithm for a Real-Life Break Scheduling Problem. Matheuristics2008 - Second International Workshop on Model Based Metaheuristics, Bertinoro, Italien, EU. http://hdl.handle.net/20.500.12708/84743

2007

  • The Minimum Shift Design Problem / Di Gaspero, L., Gärtner, J., Kortsarz, G., Musliu, N., Schaerf, A., & Slany, W. (2007). The Minimum Shift Design Problem. Annals of Operations Research, 155(1), 79–105. http://hdl.handle.net/20.500.12708/169640

2005

  • Theory and Practice of the Minimum Shift Design Problem / Di Gaspero, L., Gärtner, J., Kortsarz, G., Musliu, N., Schaerf, A., & Slany, W. (2005). Theory and Practice of the Minimum Shift Design Problem. In In Metaheuristics: Progress as Real Problem Solvers, Ibaraki, Toshihide; Nonobe, Koji; Yagiura, Mutsunori (Eds.) (pp. 159–180). Springer. http://hdl.handle.net/20.500.12708/25353

2004

2003

2002